Spacious studio with a comfortable layout, perfect for living🔥
📍 Angisa 3rd Dead End, 2
Located in a 12-story residential complex built in 2024.
The apartment comes fully finished (turnkey) and has never been occupied. Heating is provided by a gas boiler.
The building is situated in an area with well-developed infrastructure: shops, pharmacies, public transport, cafes, and restaurants – all within walking distance. Lech and Maria Kaczynski Park is just a five-minute walk away.