Black frame in the La Batumi Familia complex. Plumbing is installed, bathroom walls are built, and plastering works have begun.
The balcony is fully finished and all utilities are connected. 7th floor (effectively 8th floor) with a mountain view. All meters are paid for.
ID: 2763405