Gas: connected (in kitchen zones 1.1 and 2.1, and on the second balcony).
Water: connected and fully distributed.
Electricity: fully distributed.
Internet: connected (requires activation only).
Doors and windows: entrance iron door and high-quality metal-plastic windows installed.
(Green frame+):
Floors: floor screed is laid throughout the perimeter (except for the bathroom, which is ready for tiling).
Walls: first (rough) coat of putty applied – ready for final finishing and painting or wallpaper.
Ceiling: suspended ceiling installed.
Balcony: fully finished.