Assignment of two studio apartments in the ongoing project Silver Point, Sulaberidze st, 84
Available individually or together; apartments can be combined into a spacious 2-room unit.
Apartment areas: 29.9 and 31.5 sq. m
10th floor of 12, 16 apartments per floor.
View of the mountains and the cable car.
South-east side
Project completion is scheduled for spring 2028.
Assignment terms:
• 50% down payment (partially to the owner, partially to the developer)
• 50% installment plan until the end of spring 2028.