The exterior facade painting and hallway finishing are nearing completion, and the building will be handed over soon.
A 4-room apartment on the 8th floor featuring three bedrooms, two balconies, and stunning views.
All structural works are complete:
• electrical wiring (sockets, switches, and two-way switches)
• central heating, gas, and sewage pipes installed
• gypsum board ceilings prepared for stretch ceiling installation