A complex featuring a water park, a wellness SPA center, and apartments.
350m from the sea.
A project by Accor Group under the Mercure brand.
An "all inclusive" hotel in Georgia managed by the Accor hospitality group.
Block A delivery date: August 31, 2025.
Infrastructure will be completed between December 2025 and 2027.
The complex covers 2 hectares of land and consists of 7 blocks:
Block A – currently in pre-sales, the building has 16 floors with 29 apartments per floor. Available options:
• Sea view: apartments No. 19–29
• Batumi and sea view: No. 10–18
• Mountain and pool view: No. 1–8
The building features 2 staircases and 3 elevators, including one service lift.
Underground parking is available for 200 cars.
A restaurant (breakfast area) and a bar are located on the ground floor.
Room service is available throughout the complex.
A terrace with a bar is located on the rooftop.
Half-board and full-board meal plans can be provided.
Block A – 16 floors
Block B – consists of 6 floors, the first 4 of which house the wellness SPA center.
All other blocks will serve as individual cottages.
Due to the mountainous terrain, the blocks are positioned so that every apartment offers a beautiful sea view without buildings obstructing each other.
The entire territory is gated. On-site facilities include a water park, several swimming pools, as well as slides for adults and children's pools with slides.
• playground
• children's center with nanny service and instructors
• basketball court
• football field
• tennis court
• climbing wall with professional service and instructors
Parking is shared for guests and is not sold separately.
A thermal spring is located nearby (5 minutes away), and a private beach at the Novotel complex is just 3 minutes away. Transport to the thermal spring and the beach will be provided.
Payment plan:
• Down payment: 20–30%
• Installments until March 2026
• Promotional installment plan for 50 months
Construction: monolithic frame with thermal insulation, built to Mercure brand quality standards.
Renovation is provided exclusively by the developer according to Mercure brand standards.
Management Company: 40%, Owner: 60%
Service fee: $0.90 per sq. m
Self-renting is not permitted. The management company will begin operations once the initial infrastructure and Block A are delivered (2026).
Estimated rental rate is approximately $50/day.