1/8

Esteco Home 360

Batumi
Nobel Brothers St, 42
2 houses are under construction, next delivery in Q4 2028 
Sales from the developer are suspended
Developer

Layouts and prices for Esteco Home 360

Prices and availability are up to date as of 23 მარტის 2026
Report inaccuracies
Ceiling height: 3.0 m
Finishing options: black frame, white frame, green frame
30 – 42.7 m2
from $‍30,900
from $‍900 per m2
42.7 – 64.3 m2
from $‍39,284
from $‍900 per m2
60.6 – 74.7 m2
from $‍54,540
from $‍850 per m2

Esteco Home 360 on the map of Batumi

Project houses

Total 2 houses
Nobel Brothers St, 42
Block A
25 floors
Under construction
Completion in Q4 2028
Sales from the developer are suspended
Nobel Brothers St, 42
Block B
25 floors
Under construction
Completion in Q4 2028
Sales from the developer are suspended

Object documents

Translations of official documents into Russian are posted for informational purposes only and are not legally binding
Object passport

Construction progress Esteco Home 360

We take photos of complex from same spots, to show real status and dynamics of development.

The latest update — მარტი 2026

Construction progress Esteco Home 360 - Spot 1, მარტი 2026
Spot 1
მაისი 2020მარტი 2026
Construction progress Esteco Home 360 - Spot 2, მარტი 2026
Spot 2
აპრილი 2020მარტი 2026
Construction progress Esteco Home 360 - Spot 3, მარტი 2026
Spot 3
მაისი 2024მარტი 2026
Construction progress Esteco Home 360 - Spot 4, მარტი 2026
Spot 4
სექტემბერი 2024მარტი 2026
Construction progress Esteco Home 360 - Spot 5, მარტი 2026
Spot 5
აპრილი 2021მარტი 2026

Project characteristics

🟧 Number of buildings2
🟧 Number of floors21–25
🟧 Construction technologymonolithic
🟧 Communicationsgas, water, electricity, sewerage, heating sistem
🟧 Cadastral number05.30.26.002
🟧 Distance to the seaside150 m
🟧 Elevatorpassenger elevators, freight elevator
🟧 InfrastructureSwimming pool, gym, restaurant, grocery store
🟧 Parkingunderground parking
🟧 Security & Safety24/7 CCTV
🟧 Apartment renovationblack frame, white frame, green frame
🟧 Apartments area31–72 m2
🟧 Number of apartments375
How can we improve this page?

Information about the project

The complex on Tsaritsa Tamara Avenue is situated just 4 km from Batumi. It is also close to the coast and the picturesque Korilistskali River.

What's around?

In the immediate vicinity are the Batumi State Music Center, the Batumi Technological Museum, the Orthodox Church of St. Tamara, and a Bank of Georgia branch. Also nearby are a supermarket, a police station, and a large selection of cafes.

How to get around?

The Batumi Passenger railway station is located about 600 meters from the new building while the bus stops are only 200 meters away. Routes 10 and 10a stop here, which will help you get to most of the coastal areas of Batumi, to the airport, and to the Botanical Garden.

What are the project features?

The residential complex on Tsaritsa Tamara Avenue in Batumi consists of two buildings of up to 25 floors. The facades, decorated in white, gray, and black, look stylish and modern. They contrast favorably with the green and sea spaces surrounding the new building.

The apartments for sale range in size from 32 to 73 m2. The units are handed over with black frame finish.

Purchase with an installment plan is possible. You can clarify its conditions at the sales department of the new building.

Subscribe to updates on this residential complex
We'll send you a message as soon as we update the prices, status or construction state, add layouts or include other useful information about this building.
Like Residential complex Esteco Home 360?
Add to favorites so you will not lose it or send a link to someone who helps you with the choice of housing

This project is also called Skyscrapers BNZ.

Where is Esteco Home 360 located?

Nobel Brothers St, 42.

Which apartments are available for sale in Esteco Home 360 in Batumi?

For sale are studios, 2-room, 3-room.

How much does a m² cost in Esteco Home 360?

The price per m² in this complex starts from $‍850.

When will Esteco Home 360 be commissioned?

Block A, Block B – completion in Q4 2028.