Sale by owner! Installment plans and mortgages available!
Multi-apartment hotel and residential complex.
First coastline.
The sea is just across the road.
Three blocks – A, B, C.
Block A – for personal residence and rental management.
Block B – for personal residence and rental management.
Block C – for personal residence and rental management.
Block A – 16 floors
Block B and C – 18 floors
50–70 m from the sea.
March 2022 – start of construction for Block A.
December 2024 – completion of the Block A building structure.
December 2025 – completion of the Block B and C buildings.
• Block A – delivery in shell condition: 23.03.2025, turnkey delivery: 30.06.2025
• Block B – delivery in shell condition: 21.02.2026, turnkey delivery: 21.06.2026
• Block C – delivery in shell condition: 21.03.2026, turnkey delivery: 21.07.2026
The pier and bridge will be completed in early 2025.
The first and second floors will house a reception, cafes, restaurants, and a swimming pool.
Ceiling height:
• 1st floor – 6 m
• 2nd floor and above – 3 m
Block A
Apartments are sold renovated without furniture; or fully turnkey, including furniture, appliances, and plumbing.
Block B
Apartments are sold renovated without furniture; or fully turnkey, including furniture, appliances, and plumbing.
Block C
Apartments are sold without renovation; renovated without furniture; or fully turnkey, including furniture, appliances, and plumbing.
Block C is located behind Block B.