Sale from the developer!!!
Excellent equipment with a good view is available, please check availability!
Heroes Alley, 5min from the sea
international brand
Royal Tulip Management Company
5 star hotel
Completion of construction in 2027 - including infrastructure.
Installment plan until the end of 2027
34 floors
up to the 5th floor infrastructure
82 hotel rooms (5th-10th floors).
332 investment apartments
100 parking spaces
5 elevators
INVESTMENT APARTMENTS — THE HIGHEST PROFITABILITY
INVESTMENTS IN THE CITY FROM 10%
reception
observation deck
pool
wellness center
fitness
cinema
restaurants
lounge
vinotheque
studios, 1+1
are rented in two versions:
or renovated, with a kitchen and an equipped bathroom.
or on a turnkey basis - an additional payment of $200 per meter
Monolithic design
Panoramic two-chamber windows
Sound insulation
3m ceilings before finishing
Seismic resistance 9 points
Gas boiler for district heating
Criminal Code 40%, owner 60%
40% includes communal apartments.
Maintenance $2/m2 is not included in the management cost.
Personal account for calculating income from the Criminal Code.
A contract with the Criminal Code for 10 years. After 3 years, you can withdraw from the contract.
The residence restriction for owners when signing an agreement with the Criminal Code is 2 months a year (60 days in total per year, including 14 days per season).
The transfer is possible after paying 50% of the apartment price.
Parking is not for sale.
When using the hotel to communicate with the operator, the buyer will be registered in a special electronic program, where he/she will have a personal account. Through his personal account, the buyer will be able to effectively track/control the operation, control the distribution of income and expenses, he/she will be able to receive information about prices, bookings and other rates, as well as carry out any communication with the operating company.
Connection to service, booking systems, providers, etc. is paid by the owner separately in a fixed amount of 3,000 US dollars under the contract.
Payment plan:
booking $1,000 for 2 weeks
20% pv
60% installment plan for 48 months (until the end of 2027)
20% upon completion of construction,