📍 Address: Grigola Eliava 21
Floor: 2/11
Area: 75m²
• A frame is for sale in a building under construction
• The frame has been made, interior and facade works are underway
• Completion date is the end of 2024
• With a contribution of 40% or more, it is possible to pay in installments for a year
Note: An installment system is available for a payment of 40% or more.