📍 Address: Grigola Eliava 21
Area: 90 sqm
Floor: 3/11
• A frame is for sale in a building under construction
• The apartment has a view in both directions
• The frame has been made, interior and facade works are underway
• Completion date is the end of 2024
• With a contribution of 40% or more, it is possible to pay in installments for a year
Note: An installment system is available for a payment of 40% or more.