Apartment in the Calligraphy Towers premium complex, in Building B.
The building will be completed at the end of 2023.
The price is lower than that of the developer, below the market. There is an assignment, an installment plan until May 2024.
The apartment is in a white frame (interior partitions have been built, all communications have been installed, walls have been plastered, the floor has been plastered, the front door and double glazed windows have been installed).
Central heating.
In the complex: reception and video surveillance 24/7, swimming pool, spa, fitness, cinema, bar, restaurant.
It is located on the Alley of Heroes, 500 m from Iori Boulevard. There is a developed infrastructure around.