Sale by owner. There is an installment plan until 2026. It is possible to apply for a mortgage.
Multi-apartment hotel and residential complex.
1 coastline.
The sea is across the road.
Three blocks — A, B, C.
Block A — for personal residence and management.
Block B — for personal residence and management.
Block C is for personal residence and management.
Block A, 16 floors
Block B and C, 18 floors
50-70m from the sea.
March 2022 — construction of Block A.
December 2024 — the construction of Block A building was completed.
December 2025 — completion of construction of buildings B and C.
Block A - delivery in a frame 23.03.2025\ turnkey delivery 30.06.2025
Block B - delivery in a frame 21.02.2026\ turnkey delivery 21.06.2026
Block C - delivery in a frame 21.03.2026\ turnkey delivery 21.07.2026
The pier and bridge will be completed in early 2025.
The first and second floors of the complex will house a reception, cafes, restaurants, and a swimming pool.
Ceiling height:
1st floor — 6m
2nd floor and above — 3m
Block A
The apartments are sold renovated without furniture; renovated on a turnkey basis, including furniture, appliances, and plumbing.
Block B
The apartments are sold renovated without furniture; renovated on a turnkey basis, including furniture, appliances, and plumbing.
Block C
The apartments are sold unrenovated; renovated without furniture; renovated on a turnkey basis, including furniture, appliances, plumbing.
Block C is located behind Block B.