The apartment is in a green frame condition.
Central heating pipes are laid, and the heating system with radiators is installed. Electrical wiring is completed, and the electrical panel is assembled. Walls are lined with gypsum board.
Necessary renovation materials have already been delivered to the apartment. The building is served by both passenger and service elevators. Utility subscriptions are finalized.
The property is situated in a quiet location, ensuring a peaceful environment.