The apartment is in a newly built building, which has already been surrendered and partially inhabited. White frame.
Repair works:
•There is air conditioner wiring
• Electricity and water supply is fully completed
• The floor is tiled
• All bathroom plumbing is installed: shower, toilet, furniture
• Work is underway on the installation of air conditioners and boiler