The apartment is in green frame condition.
Central heating pipes are laid, and the heating system with radiators is installed.
Electrical wiring is distributed, and the electrical panel is assembled.
The walls are covered with plasterboard.
Construction materials for renovation works are already delivered to the apartment.
The building is serviced by passenger and freight elevators.
All utility subscriptions are completed.
The apartment is located in a quiet area, ensuring peace and tranquility.