The apartment is in a green frame condition.
Central heating pipes are laid, and the heating system with radiators is installed. Electrical wiring is completed, and the electrical panel is assembled. Walls are lined with gypsum board.
Materials needed for renovation works are already delivered to the apartment. The building is served by both passenger and service elevators. Utility subscription is completed. The apartment is situated in a quiet location, ensuring a peaceful environment.