The apartment is in green frame condition.
Central heating pipes are laid, and the heating system with radiators is installed.
Electrical wiring is completed, and the electrical panel is assembled.
Walls are covered with gypsum board.
Materials required for renovation works are already delivered to the apartment.
The building is served by passenger and freight elevators.
Utility subscriptions are active.
The apartment is located in a quiet area, ensuring peace and tranquility.