The apartment is in green frame condition. Central heating pipes are laid, and the heating system with radiators is already installed. Electrical wiring is completed, the electrical panel is assembled, and walls are finished with gypsum board.
Necessary construction materials for renovation are already delivered to the unit. The building features both passenger and service elevators. Utility subscriptions are completed. The apartment is situated in a quiet location, ensuring peace and comfort.