The apartment is located in a quiet area, away from any noise disturbance. It is in green frame condition.
Central heating pipes are laid, and the heating system with radiators is installed. Electrical wiring is completed, the electrical panel is assembled, and walls are finished with gypsum board. Construction materials needed for renovation are already delivered to the apartment.
The building features both passenger and freight elevators. Utility subscriptions are completed. Underground parking is available.