Ravillas
in Batumi

Villas
from ‍574 579 ₾
Price / m2
from ‍3 650 ₾
GEL
USD
Developer
Address
Khelvachauri, Salibauri

Layouts and prices for Ravillas

Prices and availability are up to date as of 26 ноября 2024. Please check with your consultant for the most accurate information.
3-room villas
157.4–212.9 m2
from ‍3 650 ₾ / m2from ‍574 579 ₾

Ravillas on the map of Batumi

Khelvachauri, Salibauri

Installment in Ravillas

30%
down
payment
up to 2 years 2 months
loan
term

Mortgage in Ravillas

Please note that all calculations provided are approximate. For the final figures, we recommend consulting with both the bank and the developer
GEL
USD
You borrow ‍488 392 ₾ from the bank
years
months
Mortgage from TBC Bank
12,5
%
annual interest
rate
43 507
payment for
month
14,14
%
effective interested rate that linked to a public
index
608 271
total for real
estate

Project characteristics

About the house

🟧 Number of buildings12
🟧 Number of floors2–3
🟧 Cadastral number22.22.09.033
🟧 Communicationsgas, water, electricity, sewerage, heating system
🟧 Distance to the seaside1500 m
🟧 Infrastructurerecreational area, swimming pool
🟧 Parkingground level parking

About the units

🟧 Apartment renovationblack frame, white frame, turn key
🟧 Apartments area157.4–212.9 m2
🟧 Ceiling height3.0 m
How can we improve this page?
Other websites about the project
Subscribe to updates on this residential complex
We'll send you a message as soon as we update the prices, status or construction state, add layouts or include other useful information about this building.
Like Residential complex Ravillas?
Add to favorites so you will not lose it or send a link to someone who helps you with the choice of housing

Which apartments are available for sale in Ravillas in Batumi?

For sale are 3-room villas.

How much does a m² cost in Ravillas?

The price per m² in this complex starts from ‍3 650 ₾.

How to buy an apartment in Ravillas in Batumi?

In this complex you can buy apartments with Mortgage from TBC Bank, Installment terms.

When will Ravillas be commissioned?

Block B ( Villa 3,4,5,6), Block A (Villa 9,10,11,12) – completion in Q4 2026.