We take photos of complex from same spots, to show real status and dynamics of development.
The latest update — ოქტომბერი 2019
| 🟧 Number of buildings | 1 |
| 🟧 Number of floors | 10 |
| 🟧 Construction technology | monolithic-frame |
| 🟧 Communications | electricity, water, sewerage, natural gas |
| 🟧 Cadastral number | 01.10.17.045.011 |
| 🟧 Elevator | 1 passenger elevator |
| 🟧 Parking | underground parking (1-level, 22 parking spaces), guest parking |
| 🟧 Apartment renovation | black frame |
| 🟧 Apartments area | 70–164,1 m2 |
| 🟧 Number of apartments | 13 |
New House on Chikovani Street residential complex in Tbilisi is located in the Saburtalo district, one and a half kilometers from the city hall.
The nearest bus stop is a two-minute walk away. Two public transport routes run nearby, with a minimum interval of twenty-four minutes. The area is also convenient thanks to the metro – the “Technical University” station is approximately seven hundred meters away.
Near the complex there are several grocery stores, supermarkets, and cafes, and a McDonald’s is located nearby.
The Polytechnic Institute is less than a five-minute walk away. Families with children can choose from Secondary Schools No. 195, No. 61, and No. 162, while Kindergarten No. 112 is located six hundred meters away. The Kuzanov clinic operates within a few minutes’ walk. The “Vreme Kino” cinema is within a ten-minute walk. Mziuri Park and the Tbilisi Zoo are less than two hundred meters away.
The New House on Chikovani Street residential complex is constructed using monolithic frame technology, featuring a monolithic load-bearing structure and a strong reinforced concrete foundation.
The ten-storey building is constructed from environmentally friendly materials. The developer has implemented panoramic glazing for windows and balcony doors. The facade is decorated with French balconies as well as standard-size balconies with elegant wrought metal railings. The external walls are insulated and provide high energy efficiency.
The building is equipped with modern engineering systems, and the single entrance features a silent passenger elevator.
Driveways and pedestrian walkways are arranged within the complex territory, and street lighting is installed. The project provides parking spaces for temporary vehicle parking. A two-level underground parking is located in the basement of the building, accessible directly by elevator.
The developer offers apartments with areas ranging from 70 to 164 m², available in two- and three-room layouts.
The official website provides information about purchase conditions, as well as details on whether mortgage and installment options are available.